What Would It Take For Turkey To Build A Nuclear Bomb?

That was how David Sanger teased his and William Broad’s article on Twitter.

Unfortunately that is not how the article is written. If you want to read it, write it, they say, so here goes.

In September, Turkey’s President Recep Tayyip Erdogan said “Some countries have missiles with nuclear warheads,” but the West insists “we can’t have them. This, I cannot accept.”

This is concerning because Turkey is one of the nations that could be capable of building a nuclear weapon and may have taken steps in that direction in the past. Iran’s past work on nuclear weapons and Saudi Arabia’s inordinate interest in acquiring the nuclear fuel cycle could motivate Turkey in that direction again.

But this is one statement, and there is no evidence that Turkey is taking steps toward a nuclear weapon.

Step 1. The decision. The Turkish government would have to decide to withdraw from or violate the Nuclear Nonproliferation Treaty, which they joined in 1980. Building nuclear weapons would also damage, and possibly violate, their treaty obligations under NATO. The cost of a nuclear weapons program would have to be considered as well. Turkey probably could support such a program, but at great cost to the rest of Turkey’s economy. No such decision has been taken.

Step 2. Mining and milling uranium. Sanger and Broad refer ominously to Turkey’s uranium deposits as one of the “makings of a bomb program.” But increased activity at mines is easy to see on overhead photos, and none has been reported. I wouldn’t be surprised to see one of the open-source intelligence organizations prepare a report in the next few weeks.

Step 3. Building centrifuges and/or a reactor. Turkey may have some of the information necessary; Sanger and Broad note that information from A.Q. Khan may have reached Turkey, although they do not say what or if it is being used to build centrifuges. Russia is building four commercial reactors at Akkuyu on the Mediterranean  coast. Other projects have been proposed but are still on paper.* Russia’s reactor contracts always include taking back the spent nuclear fuel.

Step 4. Fabricating reactor fuel. Sanger and Broad note that Turkey has done some of this at pilot scale.

Step 5. Recovering plutonium. Spent nuclear fuel, if Turkey retained it from the reactors not yet built rather than contractually sending it back to Russia, can be reprocessed to separate plutonium; Sanger and Broad say that Turkey has done some work in this area, but do not specify at what scale. Bench-scale experiments seem most likely.

Step 6. Fabricating enriched uranium or plutonium into a bomb. There is no evidence that Turkey has looked into this, in terms of materials processing or design.

Bottom line: A lot would have to happen before we need to worry about Turkey getting a nuclear bomb. The alternative would be to take the American bombs at the Incirlik Air Base, but once again, the decision to do that seems far from the current position of the Turkish government.

Here’s one of the reports referenced by Sanger and BroadThe author also posted a Twitter thread, saying clearly that there is no reason to believe that Turkey would pursue a nuclear weapon any time soon.

And, if the Times article had followed the plan that Sanger’s tweet teased, it would have had to conclude that too.

__________________________________

*Thanks to Dan Yurman for information on reactor projects. If you want to know more about the business side of nuclear energy, follow him on Twitter and read his blog.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s